Investment site No.18 in the field of housing construction development

Investment site No.18 in the field of housing construction development

General information

Name of the investment project:
multi-storey residential development complex
Location:
village Yunost
Estimated area of the investment site (ha):
13.3
Terms of investment site development:
2 stage
Suggested conditions for attracting investors:
ransom, rent
Nearby production facilities and distance to them:
-
Type of the right to land lot and real estate in the territory of the investment site:
-

Basic urban-planning characteristics

Functional purpose of the territory of the investment site:
multi-storey residential buildings
Main types of facilities, placement of which is possible in the territory of this investment site, and their characteristics:
multi-storey residential buildings, social service facilities, engineering infrastructure facilities
Permitted number of storeys (stories):
9 and more
Possibility to expand the land lot:
no
Need to amend the Land Use and Development Rules in order to ensure the possibility of the proposed development of the investment site:
yes
Availability of sanitary protection zones and other zones with special conditions for the use of the territory, the hazard class of the facility (zone type):
no
Total area of residential buildings, the construction of which is possible on this investment site (thousand square meters of living area):
84.2

Parameters of the housing sector and social infrastructure (for investment sites that provide for housing construction)

Estimated provision of the population with the total area of residential facilities within the investment site (sq.m/person)

Currently:
0
In the future:
30

Level of provision of preschool educational institutions (% of the standard)

Currently:
0
in the future:
137

Level of provision of general education institutions (% of the standard)

Сurrently:
0
In the future :
100

Level of provision of additional education organizations (% of the standard)

Currently:
0
In the future :
89

Level of provision of sports and sports halls (% of the standard)

Currently:
0
In the future:
100

Engineering infrastructure

Maximum estimated water consumption (water quality complying with the SanPIN requirements) (cu. m/day)

Сurrently:
145
In the future::
895

Availability of centralized water supply (%)

Сurrently:
40
In the future :
100

Maximum total sewage flow (cu. m/day)

Currently:
115
In the future :
725

Provision of centralized sewerage (%)

Сurrently:
0
In the future :
100

Maximum estimated heat consumption (Gcal/year)

Сurrently:
4470
In the future :
30860

Provision of centralized heat supply (%)

Сurrently:
0
In the future :
100

Maximum estimated power consumption (million kW. h/year)

Сurrently:
1,1
In the future :
5,9

Electricity supply (%)

Сurrently:
100
In the future :
100

Transport infrastructure

Distance from the city center (km):
8.5
Distance from the motorway (km):
0.1
Distance from the railway station (km):
2
Distance from the airport (km):
11
Distance from the river port/seaport/pier (km):
12.9
Duration of the trip to the center of the municipality of the investment site (minutes):
26

Availability of public transport stops within a five-minute walk

Currently:
да
In the future:
да

Garages, parking lots for cars (car-places)

Currently:
-
In the future :
1180

General improvement and landscaping

Possible types of facilities for improvement:
landscaping of courtyard territories, landscaping of streets, roads and driveways, landscaping of social services facilities
Share of landscaped territory in the total area of the investment site (%):
40

Main economic characteristics

Estimated cost of development of the investment site territory (thousand Rubles):
7054730
Amount of investments made by the investor (thousand Rubles):
4799460
Amount of investments of the municipality (including the estimated value of municipal property is taken into account) (thousand Rubles):
1831970
Apply for investment site
3
1
2
0