Name of the investment project:
construction of tourist camp (estimated capacity: 160 places)
Location:
South-western region, Zayachy Island
Estimated area of the investment site (ha):
2
Terms of investment site development:
2 stage
Suggested conditions for attracting investors:
ransom, rent
Nearby production facilities and distance to them:
asphalt plant, 1 km
Type of the right to land lot and real estate in the territory of the investment site:
-
Basic urban-planning characteristics
Functional purpose of the territory of the investment site:
recreation objects, tourism and sanatorium-and-spa treatment
Main types of facilities, placement of which is possible in the territory of this investment site, and their characteristics:
recreation center
Permitted number of storeys (stories):
5
Possibility to expand the land lot:
yes
Need to amend the Land Use and Development Rules in order to ensure the possibility of the proposed development of the investment site:
yes
Availability of sanitary protection zones and other zones with special conditions for the use of the territory, the hazard class of the facility (zone type):
no
Total area of the territories for the placement of agricultural production facilities\industrial or municipal warehousing facilities (ha)):
2
Engineering infrastructure
Maximum estimated water consumption (water quality complying with the SanPIN requirements) (cu. m/day)
Сurrently:
-
In the future::
45 (detailed in project)
Availability of centralized water supply (%)
Сurrently:
0
In the future :
100
Maximum total sewage flow (cu. m/day)
Currently:
-
In the future :
35 (detailed in project)
Provision of centralized sewerage (%)
Сurrently:
0
In the future :
100
Maximum estimated heat consumption (Gcal/year)
Сurrently:
-
In the future :
510 (detailed in project)
Provision of centralized heat supply (%)
Сurrently:
0
In the future :
0
Maximum estimated power consumption (million kW. h/year)
Сurrently:
-
In the future :
(detailed in project)
Electricity supply (%)
Сurrently:
0
In the future :
100
Transport infrastructure
Distance from the city center (km):
6.2
Distance from the motorway (km):
0.5
Distance from the railway station (km):
4.1
Distance from the airport (km):
12.6
Distance from the river port/seaport/pier (km):
10.7
Duration of the trip to the center of the municipality of the investment site (minutes):
19
Availability of public transport stops within a five-minute walk
Currently:
no
In the future:
no
Garages, parking lots for cars (car-places)
Currently:
-
In the future :
-
General improvement and landscaping
Possible types of facilities for improvement:
landscaping of the recreational area
Main economic characteristics
Estimated cost of development of the investment site territory (thousand Rubles):
120333
Amount of investments made by the investor (thousand Rubles):
95440
Amount of investments of the municipality (including the estimated value of municipal property is taken into account) (thousand Rubles):
24893