General information
Name of the investment project:
Construction of furniture production plant (estimated capacity: 12 thousand products per year)
Location:
Northern planning area, northern bypass of the city of Surgut
Estimated area of the investment site (ha):
2
Terms of investment site development:
3 stage
Suggested conditions for attracting investors:
ransom, rent
Nearby production facilities and distance to them:
-
Type of the right to land lot and real estate in the territory of the investment site:
-
Basic urban-planning characteristics
Functional purpose of the territory of the investment site:
objects of agricultural purpose
Main types of facilities, placement of which is possible in the territory of this investment site, and their characteristics:
objects of agricultural purpose
Permitted number of storeys (stories):
3
Possibility to expand the land lot:
yes
Need to amend the Land Use and Development Rules in order to ensure the possibility of the proposed development of the investment site:
yes
Availability of sanitary protection zones and other zones with special conditions for the use of the territory, the hazard class of the facility (zone type):
sanitary protection zone
Total area of the territories for the placement of agricultural production facilities\industrial or municipal warehousing facilities (ha)):
2
Engineering infrastructure
Maximum estimated water consumption (water quality complying with the SanPIN requirements) (cu. m/day)
Сurrently:
-
In the future::
(уточнить проектом)
Availability of centralized water supply (%)
Сurrently:
0
In the future :
0
Maximum total sewage flow (cu. m/day)
Currently:
-
In the future :
(detailed in project)
Provision of centralized sewerage (%)
Сurrently:
0
In the future :
0
Maximum estimated heat consumption (Gcal/year)
Сurrently:
-
In the future :
160 (detailed in project)
Provision of centralized heat supply (%)
Сurrently:
0
In the future :
0
Maximum estimated power consumption (million kW. h/year)
Сurrently:
-
In the future :
(detailed in project)
Electricity supply (%)
Сurrently:
0
In the future :
100
Transport infrastructure
Distance from the city center (km):
20.6
Distance from the motorway (km):
0.1
Distance from the railway station (km):
9.3
Distance from the airport (km):
9.1
Distance from the river port/seaport/pier (km):
24.7
Duration of the trip to the center of the municipality of the investment site (minutes):
62
Availability of public transport stops within a five-minute walk
Currently:
no
In the future:
no
Garages, parking lots for cars (car-places)
Currently:
-
In the future :
-
General improvement and landscaping
Possible types of facilities for improvement:
landscaping of production territory
Main economic characteristics
Estimated cost of development of the investment site territory (thousand Rubles):
25830
Amount of investments made by the investor (thousand Rubles):
25830
Опубликовано: 19.11.2017
Изменено: 13.12.2017