Name of the investment project:
Сonstruction of enterprise in the field of deep oil processing (capacity of not less than 50 thousand tons per year)
Location:
Eastern municipal district
Estimated area of the investment site (ha):
5
Terms of investment site development:
2 stage
Suggested conditions for attracting investors:
ransom, rent
Nearby production facilities and distance to them:
-
Type of the right to land lot and real estate in the territory of the investment site:
-

Basic urban-planning characteristics

Functional purpose of the territory of the investment site:
for production and municipal warehousing purposes
Main types of facilities, placement of which is possible in the territory of this investment site, and their characteristics:
refineries
Permitted number of storeys (stories):
3
Possibility to expand the land lot:
no
Need to amend the Land Use and Development Rules in order to ensure the possibility of the proposed development of the investment site:
yes
Availability of sanitary protection zones and other zones with special conditions for the use of the territory, the hazard class of the facility (zone type):
Sanitary protection zone
Total area of the territories for the placement of agricultural production facilities\industrial or municipal warehousing facilities (ha)):
5

Engineering infrastructure

Maximum estimated water consumption (water quality complying with the SanPIN requirements) (cu. m/day)

Сurrently:
-
In the future::
(detailed in project)

Availability of centralized water supply (%)

Сurrently:
0
In the future :
100

Maximum total sewage flow (cu. m/day)

Currently:
-
In the future :
(detailed in project)

Provision of centralized sewerage (%)

Сurrently:
0
In the future :
0

Maximum estimated heat consumption (Gcal/year)

Сurrently:
-
In the future :
(detailed in project)

Provision of centralized heat supply (%)

Сurrently:
0
In the future :
0

Maximum estimated power consumption (million kW. h/year)

Сurrently:
-
In the future :
(detailed in project)

Electricity supply (%)

Сurrently:
0
In the future :
100

Transport infrastructure

Distance from the city center (km):
16.4
Distance from the motorway (km):
3
Distance from the railway station (km):
18.3
Distance from the airport (km):
12.5
Distance from the river port/seaport/pier (km):
13.1
Duration of the trip to the center of the municipality of the investment site (minutes):
49

Availability of public transport stops within a five-minute walk

Currently:
no
In the future:
no

Garages, parking lots for cars (car-places)

Currently:
-
In the future :
-

General improvement and landscaping

Possible types of facilities for improvement:
landscaping of production territory

Main economic characteristics

Estimated cost of development of the investment site territory (thousand Rubles):
2095700
Amount of investments made by the investor (thousand Rubles):
2095700
Amount of investments of the municipality (including the estimated value of municipal property is taken into account) (thousand Rubles):
16500
Apply for investment site